Hitachi HDS Certified Implmenter-Enterprise 認定 HH0-210 試験問題:
1. You have replaced a part on a VSP. What are three mandatory steps to complete your maintenance task? (Choose three.)
A) Check the maintenance screen for any blinking parts.
B) Set the SVP application back to View Mode.
C) Complete the "Last maintenance" form inside the DKC door.
D) Reboot the SVP to renew the configuration.
E) Complete the corresponding SIM(s).
2. You want to install license keys as part of a VSP new installation. Which tool must you use?
A) Storage Navigator 2
B) SVP Maintenance Screen
C) Device Manager
D) Web Console
3. After opening a case with the Hitachi Data Systems technical support center, you have been asked to collect error information. How do you send the collected data to the technical support center?
A) Send an email to [email protected].
B) Upload to https://tuf.hds.com.
C) Upload to ftp://ftp.hds.com.
D) Upload to http://www.hds.com.
4. You want to install Hitachi Dynamic Link Manager (HDLM) on a customer's server but you are not sure if the server HBA types and versions are supported. Which two actions would help you find this information? (Choose two.)
A) Call the HDS Customer Support Center.
B) Access the HiFire Web site to verify the configuration.
C) Check the HDLM release notes.
D) Check the HDLM Concepts and Planning Guide.
5. Which two statements describe what will happen when a CHA board is replaced on a VSP? (Choose two.)
A) Zoning does not need to be changed if WWN zoning is used.
B) WWN will remain the same with the new board.
C) WWN will change with the new board.
D) Zoning must be changed if WWN zoning is used.
質問と回答:
質問 # 1 正解: A、B、E | 質問 # 2 正解: D | 質問 # 3 正解: B | 質問 # 4 正解: B、C | 質問 # 5 正解: A、B |