IBM Cognos 10 Planning Application 認定 COG-700 試験問題:
1. If a D-List item name is very long, it will result in a very wide column if that dimension of the D-Cube is placed on columns in Analyst. Which character can the modeler include in the D-List item to cause a line break so the column heading displays on two or more lines?
A) ; (semi-colon)
B) , (comma)
C) - (hyphen)
D) | (pipe)
2. The items in the Products D-List contain product names with their respective codes (such as 012 Star Dome). The file used to create this D-List has been updated to include new names for some of the products (such as 012 Solar Dome). When running the import link, which settings must the modeler define to replace old names in the D-List with new names while retaining manually entered subtotals and existing D-Cube data?
A) Use the Append import mode and select "remove obsolete items"
B) Use the Update import mode and define unique names
C) Use the Append import mode and define unique names
D) Use the Update import mode and select "remove obsolete items"
3. The Gross Profit % item in the Profit and Loss D-List is formatted as numeric with one decimal place and a percent sign (such as 0.0%). The modeler then formats the Profit and Loss D-Cube to display all data as numeric with two decimal places and no percent sign. How will data for the Gross Profit % item appear?
A) Numeric with two decimal places and a percent sign
B) Numeric with one decimal place and a percent sign
C) Numeric with one decimal place and no percent sign
D) Numeric with two decimal places and no percent sign
4. What control(s) must be applied to a cell to prevent breakback, direct data entry, and data loading using a D-Link?
A) Lock and Protect
B) Hold and Protect
C) Lock will prevent all three
D) Hold and Lock
5. Which kind of D-Link should a modeler use to pull data from a source D-Cube and place it into the target D-Cube based on D-List formatted data that is already in the target D-Cube?
A) Accumulation D-Link
B) D-Link using D-Cube allocation
C) D-Link using local allocation
D) Lookup D-Link
質問と回答:
| 質問 # 1 正解: D | 質問 # 2 正解: B | 質問 # 3 正解: B | 質問 # 4 正解: D | 質問 # 5 正解: D |














0 お客様のコメント
品質保証JPexamはIT認定試験のシラバスに従って、試験問題の範囲を正確に絞って、的中率が99%の最新問題集を捧げます。
1年間の無料更新サービスJPexamは1年以内に問題集の無料更新サービスを提供し、お客様がいつでも最新版の問題集を持つことを保証いたします。もし試験の内容が変更されたら、弊社は直ちにお客様にお知らせします。それに、弊社の問題集が更新されたら、早速メールで最新バージョンを送付いたします。
全額返金JPexamの問題集を利用すると、短時間で勉強しても試験に合格できるのを保証いたします。試験に不合格になってしまった場合、弊社は全額返金いたします。(
ご購入前のお試しJPexamは問題集のサンプルを無料で提供いたします。ご購入前にサンプルを試用して製品の品質を確認することができます。ご遠慮なく利用してください。
