CMAA Certified Construction Manager (CCM) 認定 Construction-Manager 試験問題:
1. The CM is tasked with analyzing the schedule variance of a project on a regular basis. The contractor's recent payment application includes a dramatic increase in earned hours than what was budgeted for the project. This MOST likely indicates
A) the contractor will be submitting change orders.
B) the project is ahead of schedule.
C) the contractor is making more profit than anticipated.
D) the project is behind schedule.
2. While conducting an inspection of the work in progress for a design-bid-build project, a CM notices that some of the completed work does not conform to the construction documents. The FIRST thing the CM should do is
A) discuss the concerns with the owner.
B) direct the contractor to correct the non-conforming work.
C) schedule a meeting with the design professionals and the client to discuss the issues.
D) document the non-conforming work and distribute the documentation to the contractor, design professional, and client.
3. What are the basic responsibilities of an Agency CM related to safety on a construction project?
A) To manage the safety of the construction contractor's personnel, the designer's personnel, and the Agency CM's personnel
B) To oversee the safety of the construction contractor's personnel
C) To monitor the safety of the designer's personnel
D) To execute safety requirements that are spelled out by the Agency CM's contract with the owner and statutes/laws
4. The current construction market is extremely busy, and the trade/sub-contractors are being very selective in the projects they bid on. What options do owners have when the marketplace is vastly different from when their project was a concept to when its ready to be advertised?
A) Advertise the project and award to lowest bidder.
B) Postpone advertising for one year.
C) Market conditions should not be a factor in when a project is advertised.
D) Consider the impacts of current market conditions and revise project strategy.
5. When developing schedule specifications, which of the following practices should the CM recommend to the Owner to avoid disputes regarding weatherdelays per year?
A) Ask the contractor to specify the number of weather days they believe necessary for the project.
B) Defer all issues related to weather to NOAA.
C) Using a recognized reference such as NOAA. define the number of allowable "normal" weather impact days expected to occur on the project within the contract documents.
D) Consult a local meteorologist to determine the best estimate of the number of weather days to allow on the project.
質問と回答:
| 質問 # 1 正解: D | 質問 # 2 正解: D | 質問 # 3 正解: D | 質問 # 4 正解: D | 質問 # 5 正解: C |














774 お客様のコメント
品質保証JPexamはIT認定試験のシラバスに従って、試験問題の範囲を正確に絞って、的中率が99%の最新問題集を捧げます。
1年間の無料更新サービスJPexamは1年以内に問題集の無料更新サービスを提供し、お客様がいつでも最新版の問題集を持つことを保証いたします。もし試験の内容が変更されたら、弊社は直ちにお客様にお知らせします。それに、弊社の問題集が更新されたら、早速メールで最新バージョンを送付いたします。
全額返金JPexamの問題集を利用すると、短時間で勉強しても試験に合格できるのを保証いたします。試験に不合格になってしまった場合、弊社は全額返金いたします。(
ご購入前のお試しJPexamは問題集のサンプルを無料で提供いたします。ご購入前にサンプルを試用して製品の品質を確認することができます。ご遠慮なく利用してください。