SAP Certified Application Associate - SAP Integrated Business Planning 認定 C_IBP_2005 試験問題:
1. You have set up a planning area and data is available. You adjust the necessary time profile settings and run the consistency check.
Which settings can you change and still run a successful consistency check?
There are 2 correct answers to this question.
Response:
A) Add a new time profile level to the time profile.
B) Change the past and future horizon of the levels in the time profile.
C) Remove an attribute assigned to the time profile level if the attribute is used in a planning level.
D) Change the description of the attributes in a time profile.
2. Which of these conditions must be met to create a Local Member key figure?
Please choose the correct answer.
Response:
A) Key Figure is selected in the Key Figures tab in Excel add-on
B) Use Excel Cell References in Report Editor is selected
C) Activate Local Member Recognition is selected
D) Key Figure is created in the Planning Area app
3. You need to create various planning operators. Which operators must you assign to your planning area to view them in Microsoft Excel?
There are 2 correct answers to this question.
Response:
A) Copy Operator
B) Statistical Forecasting
C) Check Mode Operator
D) Disaggregation Operator
4. Which of the following conditions are relevant for subtotals in planning view?
There are 2 correct answers to this question.
Response:
A) Only attribute-based totals can be added.
B) Total number of attributes that can use subtotals in the planning view can be restricted.
C) The values of the attribute-based total at the highest attribute level in the planning level can be changed.
D) Total value can be added before or after the selected attribute.
5. You create an S&OP operator for heuristics on an SAP IBP project. What must you enable for the S&OP operator which is specifically relevant for sub networks?
Please choose the correct answer.
Response:
A) Compute Expected Supply parameter
B) Normalize Quotas parameter
C) Balance Receipts parameter
D) Node-Based isolation check
質問と回答:
| 質問 # 1 正解: B、D | 質問 # 2 正解: C | 質問 # 3 正解: B、D | 質問 # 4 正解: B、D | 質問 # 5 正解: A |














1030 お客様のコメント
品質保証JPexamはIT認定試験のシラバスに従って、試験問題の範囲を正確に絞って、的中率が99%の最新問題集を捧げます。
1年間の無料更新サービスJPexamは1年以内に問題集の無料更新サービスを提供し、お客様がいつでも最新版の問題集を持つことを保証いたします。もし試験の内容が変更されたら、弊社は直ちにお客様にお知らせします。それに、弊社の問題集が更新されたら、早速メールで最新バージョンを送付いたします。
全額返金JPexamの問題集を利用すると、短時間で勉強しても試験に合格できるのを保証いたします。試験に不合格になってしまった場合、弊社は全額返金いたします。(
ご購入前のお試しJPexamは問題集のサンプルを無料で提供いたします。ご購入前にサンプルを試用して製品の品質を確認することができます。ご遠慮なく利用してください。